Osculati Maintenance Cycle For Desalinators Phase 2 for desalinators
20,00 €
- Satisfaction Guaranteed
- No Hassle Refunds
- Secure Payments
The cycle uses 3 specific products.Phase 1 and Phase 2 have to be combined when a drop in performance occurs – usually when diaphragms are incrustated – or once a year.Phase 3 is recommended when the desalinator is not going to be used for a long time. It prevents deposits and stains. Not to be used for energy recovery systems (such as SCHENKER, SPECTRA).The 1-l package is needed for the treatment of any desalinator, no matter the boat. Phase products have a 20-minute cycle time.






Osculati Built-in Side Navigation Lights Made Of Abs Built-in ABS navigation light red/white
Osculati Guardian Speedometers Guardian speedometer 0-30 knots white 12 V
Osculati Led Spotlight LED spotlight
Osculati Pedestal With Swivel Slide Pedestal w/swivel slide sandblasted base 45-62 cm
Osculati Fuel Level Gauge Fuel level gauge 10-180 ohm white/glossy
Osculati Battery Switch With Stainless Steel Body Spare key for 14.386.02
Osculati Level Sensor With Nmea 2000 Outlet Signal Black water level sensor NMEA 2000 150 mm
Osculati Locks With Swivelling Lock From One Side And Key Lock Release From The Other Lock left without handle 133x70 mm
Osculati Built-in Side Navigation Lights Made Of Abs Built-in ABS navigation light green/black
- Pull Handle With Pulling System Pull handle chromed brass w/key
Osculati Utility Battery-powered Navigation Lights Made Of Abs Set of battery-operated navigation lights
Carling Technologies Carling Switch Contura Ii Switch ON-OFF-ON switch red LED 24 V